top of page

SARASOTA NATIONAL CEMETARY

Project Description

SARASOTA NATIONAL CEMETARY

Administered by the United States Department of Veterans Affairs this is the sixth cemetery developed in Florida for the burial of members of the armed forces.  The architectural services for this project were provided as a consultant to Miller Legg & Associates. The 295 acre site includes burial space, cremation areas, signage and support structures and is intended to serve veterans for the next 50 years.  Phase 1 includes a public information and administration center with restrooms; a utility building with a backup generator and irrigation equipment; a site and vehicle maintenance build; two solar-powered shelters for committal services during inclement weather; as well as, an assembly area with a memorial wall, columbarium, and flag areas.

Location: Sarasota, FL

Total Size: 295 Acres

Construction Cost: $65,000,000.00

Owner: Department of Veteran Affairs

Structural Engineers: Martinez Engineering Group

Mechanical, Electrical Engineers: TLC Engineering For Architecture

bottom of page