Project Description
MIAMI INTERNATIONAL AIRPORT SOUTH TERMINAL
LEVEL 3 BAGGAGE SCREENING
Project consists of the reconfiguration of the conveyor belts and the associated TSA required technology for bag tracking. The purpose of this project is to bring the existing ETD room, within MIA South Terminal, into compliance with the latest ergonomic standards required by the TSA for their employees. In order to achieve these new standards, which eliminate the need for the lifting of bags, the conveyor belts and related elements (ie. lights, sprinklers, CCTV) within the room required reconfiguration.
Location: Miami, Florida
Total Size: 3,720 SF
Construction Cost: $450,000.00
Owner: Miami-Dade Aviation Department